6-8
2012-2016年固定资产投资项目新增主要生产能力 |
Newly
Increased Production Capacity of Investment |
in Fixed Assets(2012-2016) |
|
|
|
|
|
|
|
能力名称 |
Item |
2012 |
2013 |
2014 |
2015 |
2016 |
|
|
|
|
|
|
|
原煤开采
(万吨/年) |
Coal Mining
(10 000 tons/year) |
1095 |
1091 |
500 |
45 |
135 |
洗煤
(万吨/年) |
Coal washing
(10 000 tons/year) |
420 |
400 |
841 |
40 |
|
天然原油
(万吨/年) |
Petroleum Extraction
(10 000 tons/year) |
|
|
|
200 |
35 |
天然气开采
(亿立方米/年) |
Extraction of Petroleum and Natural Gas |
|
|
|
|
0.3 |
|
(100 million cu.m/year) |
|
|
|
|
|
铁矿开采(原矿)
(万吨/年) |
Iron Ore Mining
(10 000 tons/year) |
430.5 |
68.2 |
19.0 |
|
|
铁矿石成品矿
(万吨/年) |
Finished Products of Iron Ore Mine |
|
|
|
|
|
|
(10 000 tons/year) |
|
|
|
|
|
炼铁
(万吨/年) |
Iron-making
(10 000 tons/year) |
|
|
|
|
|
炼钢
(万吨/年) |
Steel-making
(10 000 tons/year) |
|
|
|
|
|
初轧
(万吨/年) |
Rolling Early
(10 000 tons/year) |
|
|
|
|
|
铁合金
(万吨/年) |
Iron Alloy
(10 000 tons/year) |
13.3 |
39.2 |
2.6 |
|
|
热轧钢材
(万吨/年) |
Hot-rolled Steel
(10 000 tons/year) |
|
|
|
|
|
钢丝
(万吨/年) |
Wire Steel
(10 000 tons/year) |
|
|
|
|
|
铜采矿(原矿)
(万吨/年) |
Copper Ore Mining
(10 000 tons/year) |
727.0 |
919.5 |
52.0 |
30.0 |
|
铜选矿(处理原矿)
(万吨/年) |
Copper Ore Dressing:Crude Ore Processing |
|
60 |
0.03 |
|
|
|
(10 000 tons/year) |
|
|
|
|
|
铜含量
(吨/年) |
Copper Content
(ton/year) |
|
|
|
2862 |
4000 |
铜冶炼
(吨/年) |
Copper Smelting
(ton/year) |
|
|
|
|
|
#电解铜 |
Electrolytic Copper
(ton/year) |
|
|
|
|
|
铅锌采矿(原矿)
(万吨/年) |
Plumbum/Zinc Ore Mining(10 000 tons/year) |
10.1 |
|
20.2 |
15.3 |
|
铅锌选矿(处理原矿)
(万吨/年) |
Plumbum and Zinc Ore Dressing:Crude |
20.0 |
9.0 |
50.0 |
2.0 |
|
|
Ore
Processing
(10 000 tons/year) |
|
|
|
|
|
铅含量
(吨/年) |
Plumbum Content
(ton/year) |
|
|
20 |
|
|
锌含量
(吨/年) |
Zinc Content
(ton/year) |
|
|
|
|
|
铅冶炼
(吨/年) |
Plumbum Smelting
(ton/year) |
|
|
|
|
|
#电解铅 |
Electrolytic Plumbum |
|
|
|
|
|
镍采矿
(吨/年) |
Nickel Ore Mining
(ton/year) |
|
|
|
|
|
氧化铝
(吨/年) |
Aluminum Oxide
(ton/year) |
|
|
|
|
|
锌冶炼
(吨/年) |
Zinc Smelting
(ton/year) |
|
|
|
|
|
电解铝
(吨/年) |
Electrolytic
Aluminum
(ton/year) |
150000 |
240000 |
240000 |
|
|
粗铅
(吨/年) |
Crude Plumbum
(ton/year) |
|
|
|
|
|
铝加工
(吨/年) |
Aluminum Processing
(ton/year) |
251400 |
250800 |
1040000 |
1040000 |
300000 |
金采矿(原矿)
(万吨/年) |
Gold Ore Mining
(10 000 tons/year) |
|
|
|
|
|
金选矿(处理原矿)
(吨/年) |
Gold Ore Dressing: Crude Ore Processing |
|
|
|
|
|
|
(ton/year) |
|
|
|
|
|
金含量
(公斤/年) |
Gold Content
(kg/year) |
|
|
|
|
|
黄金
(公斤/年) |
Gold
(kg/year) |
941.5 |
1060.0 |
17.0 |
6.0 |
12.0 |
矿山成品金
(公斤/年) |
Gold
Finished
(kg/year) |
|
|
|
|
|
水力发电
(万千瓦) |
Hydraulic Power
(10 000 kw) |
306 |
902 |
861 |
67 |
515 |
火力发电
(万千瓦) |
Fire Power
(10 000 kw) |
|
|
|
66 |
35 |
输电线路长度(11万伏及以上) (公里) |
Length of Transmission Line
(km) |
2019 |
374 |
1959 |
860 |
103 |
变电设备能力(11万伏及以上)(万千伏安) |
Substation Equipment Capacity (10 000kVA) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|