6-10  2010-2014年城镇固定资产投资项目新增主要生产能力
Newly Increased Production Capacity of Investment in Fixed Assets
in Urban Area(2010-2014)
能力名称 Item 2010 2011 2012 2013 2014
               
原煤开采 (万吨/) Coal Mining                        (10 000 tons/year) 284 213 1095 1091 500
洗煤 (万吨/) Coal washing                       (10 000 tons/year) 275 420 400 841
天然原油 (万吨/) Petroleum Extraction           (10 000 tons/year) 48   
天然气开采 (亿立方米/) Extraction of Petroleum and Natural Gas  11   
                                   (100 million cu.m/year)
铁矿开采(原矿) (万吨/) Iron Ore Mining                  (10 000 tons/year) 430.5 68.2 19.0
铁矿石成品矿 (万吨/) Finished Products of Iron Ore Mine  2.8   
                                           (10 000 tons/year)
炼铁 (万吨/) Iron-making                         (10 000 tons/year)
炼钢 (万吨/) Steel-making                        (10 000 tons/year)
初轧 (万吨/) Rolling Early                       (10 000 tons/year)
铁合金 (万吨/) Iron Alloy                            (10 000 tons/year) 21.3 34.2 13.3 39.2 2.6
热轧钢材 (万吨/) Hot-rolled Steel                   (10 000 tons/year)   
钢丝 (万吨/) Wire Steel                            (10 000 tons/year)
铜采矿(原矿) (万吨/) Copper Ore Mining             (10 000 tons/year) 34.5 30.0 727.0 919.5 52.0
铜选矿(处理原矿) (万吨/) Copper Ore Dressing:Crude Ore Processing 1.5 60 0.03
                                            (10 000 tons/year)
  铜含量 (/) Copper Content                                (ton/year) 1032   
铜冶炼 (/) Copper Smelting                               (ton/year)
  #电解铜 (/)     Electrolytic Copper                       (ton/year)
铅锌采矿(原矿) (万吨/) Plumbum/Zinc Ore Mining  (10 000 tons/year) 25.0 10.1 20.2
铅锌选矿(处理原矿) (万吨/) Plumbum and Zinc Ore Dressing:Crude 30.0 0.8 20.0 9.0 50.0
  Ore Processing                 (10 000 tons/year)
  铅含量 (/) Plumbum Content                           (ton/year) 243 20
  锌含量 (/) Zinc Content                                   (ton/year) 463
铅冶炼 (/) Plumbum Smelting                           (ton/year)
  #电解铅 (/)      Electrolytic Plumbum                  (ton/year)
镍采矿 (/) Nickel Ore Mining                           (ton/year)
氧化铝 (/) Aluminum Oxide                             (ton/year)
锌冶炼 (/) Zinc Smelting                                  (ton/year) 3000
电解铝 (/) Electrolytic  Aluminum                     (ton/year) 10000 150000 240000 240000
粗铅 (/) Crude Plumbum                               (ton/year)
铝加工 (/) Aluminum Processing                       (ton/year) 250000 251400 250800 1040000
金采矿(原矿) (万吨/) Gold Ore Mining                (10 000 tons/year)
金选矿(处理原矿) (/) Gold Ore Dressing: Crude Ore Processing
                                                       (ton/year)
  金含量 (公斤/)   Gold  Content                                 (kg/year)
  黄金 (公斤/)   Gold                                               (kg/year) 502.0 941.5 1060.0 17.0
  矿山成品金 (公斤/)   Gold Finished                                  (kg/year) 160.0
水力发电 (万千瓦) Hydraulic Power                           (10 000 kw) 185 1 306 902 861
火力发电 (万千瓦) Fire Power                                   (10 000 kw) 3
输电线路长度(11万伏及以上) (公里) Length of Transmission Line                   (km) 818 4139 2019 374 1959
变电设备能力(11万伏及以上) (万千伏安) Substation Equipment Capacity  (10 000kVA)