9-10
2007-2012年城镇固定资产投资项目新增主要生产能力 |
Newly Increased
Production Capacity of Investment in Fixed Assets |
in Urban
Area(2007-2012) |
|
|
|
|
|
|
|
|
|
能力名称 |
Item |
2007 |
2008 |
2009 |
2010 |
2011 |
2012 |
|
|
|
|
|
|
|
|
|
原煤开采 |
(万吨/年) |
Coal Mining
(10 000 tons/year) |
155 |
210 |
160 |
284 |
213 |
1095 |
洗煤 |
(万吨/年) |
Coal washing
(10 000 tons/year) |
|
|
|
|
275 |
420 |
天然原油 |
(万吨/年) |
Petroleum Extraction
(10 000 tons/year) |
38 |
35 |
|
|
48 |
|
天然气开采 |
(亿立方米/年) |
Extraction
of Petroleum and Natural Gas |
15 |
21 |
|
|
11 |
|
|
|
(10 000 cu.m/year) |
|
|
|
|
|
|
铁矿开采(原矿) |
(万吨/年) |
Iron Ore Mining
(10 000 tons/year) |
1 |
2 |
|
|
|
430.5 |
铁矿石成品矿 |
(万吨/年) |
Finished
Products of Iron Ore Mine |
|
|
|
|
2.8 |
|
|
|
(10 000 tons/year) |
|
|
|
|
|
|
炼铁 |
(万吨/年) |
Iron-making
(10 000 tons/year) |
|
|
|
|
|
|
炼钢 |
(万吨/年) |
Steel-making
(10 000 tons/year) |
|
|
|
|
|
|
初轧 |
(万吨/年) |
Rolling Early
(10 000 tons/year) |
|
|
|
|
|
|
铁合金 |
(万吨/年) |
Iron Alloy
(10 000 tons/year) |
3.1 |
0.5 |
0.1 |
21.3 |
34.2 |
13.3 |
热轧钢材 |
(万吨/年) |
Hot-rolled Steel
(10 000 tons/year) |
|
|
|
|
|
|
钢丝 |
(万吨/年) |
Wire Steel
(10 000 tons/year) |
|
|
|
|
|
|
铜采矿(原矿) |
(万吨/年) |
Copper Ore Mining
(10 000 tons/year) |
26.0 |
70.0 |
244.0 |
34.5 |
30.0 |
727.0 |
铜选矿(处理原矿) |
(万吨/年) |
Copper Ore
Dressing:Crude Ore Dressing |
|
|
|
1.5 |
|
|
|
|
(10 000 tons/year) |
|
|
|
|
|
|
铜含量 |
(吨/年) |
Copper Content
(ton/year) |
|
|
|
1032 |
|
|
铜冶炼 |
(吨/年) |
Copper Smelting
(ton/year) |
|
|
|
|
|
|
#电解铜 |
(吨/年) |
Electrolytic Copper
(ton/year) |
|
|
|
|
|
|
铅锌采矿(原矿) |
(万吨/年) |
Plumbum/Zinc Ore Mining (10 000 tons/year) |
5.0 |
1.4 |
0.2 |
25.0 |
|
10.1 |
铅锌选矿(处理原矿) |
(万吨/年) |
Plumbum and Zinc Ore Dressing:Crude |
10.0 |
|
30.0 |
30.0 |
0.8 |
20.0 |
|
|
Ore
Dressing
(10 000 tons/year) |
|
|
|
|
|
|
铅含量 |
(吨/年) |
Plumbum Content
(ton/year) |
|
|
280 |
243 |
|
|
锌含量 |
(吨/年) |
Zinc Content
(ton/year) |
|
|
500 |
463 |
|
|
铅冶炼 |
(吨/年) |
Plumbum Smelting
(ton/year) |
10000 |
|
71000 |
|
|
|
#电解铅 |
(吨/年) |
Electrolytic Plumbum
(ton/year) |
|
|
|
|
|
|
镍采矿 |
(吨/年) |
Nickel Ore Mining
(ton/year) |
|
|
|
|
|
|
氧化铝 |
(吨/年) |
Aluminum Oxide
(ton/year) |
|
|
|
|
|
|
锌冶炼 |
(吨/年) |
Zinc Smelting
(ton/year) |
|
|
|
|
3000 |
|
电解铝 |
(吨/年) |
Electrolytic
Aluminum
(ton/year) |
|
|
30000 |
10000 |
|
150000 |
粗铅 |
(吨/年) |
Crude Plumbum
(ton/year) |
|
|
|
|
|
|
铝加工 |
(吨/年) |
Aluminum Processing
(ton/year) |
10000 |
|
100000 |
|
250000 |
251400 |
金采矿(原矿) |
(万吨/年) |
Gold Ore Mining
(10 000 tons/year) |
|
|
|
|
|
|
金选矿(处理原矿) |
(吨/年) |
Gold Ore Dressing: Crude Ore Dressing |
|
|
|
|
|
|
|
|
(10 000 tons/year) |
|
|
|
|
|
|
金含量 |
(公斤/年) |
Gold Content
(kg/year) |
|
|
|
|
|
|
黄金 |
(公斤/年) |
Gold
(kg/year) |
|
|
|
|
502.0 |
941.5 |
矿山成品金 |
(公斤/年) |
Gold
finished
(kg/year) |
|
|
|
160.0 |
|
|
水力发电 |
(万千瓦) |
Hydraulic Power
(10 000 kw) |
65 |
30 |
321 |
185 |
1 |
306 |
火力发电 |
(万千瓦) |
Fire Power
(10 000 kw) |
10 |
27 |
|
3 |
|
|
输电线路长度(11万伏及以上) |
(公里) |
Length of Transmission Line
(km) |
309 |
259 |
477 |
818 |
4139 |
2019 |
变电设备能力(11万伏及以上) |
(万千伏安) |
Substation Equipment Capacity (10 000kVA) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|